Consult for a pre-measure and get $25 off!

PREPARING YOUR HOME FOR INSTALLATION

Protect Your Valuables
Work Environment
Preparing Your Baseboards

PROTECT YOUR VALUABLES

  • If furniture is to be moved, please remove and box any items on or around the furniture.
  • Remove all hanging objects from the walls directly in and around the area of installation. Vibrations from the installation may cause damage to these items.
  • Disconnect and move any electronics, appliances, and computers.
  • If flooring is to be installed in a closet, remove all items on the floor and all low hanging items.
  • Our installers are not responsible for damage to valuables that have not been removed from within or around the installation area.

WORK ENVIRONMENT

Our installers will need access to an area where they can store and cut flooring materials during the course of an installation. This area is typically a back porch or a car garage.

  • Our installers will need access to electrical power in the installation and storage area.
  • The interior temperature of the installation area must be kept at a minimum of 65°F 48 hours prior to the installation and 48 hours following installation.
PREPARING YOUR BASEBOARDS
  •  In some cases, the new flooring may not be as thick as your existing floor. As a result, some of the old paint lines on your walls may show after installation. You may have to repaint any painted baseboards after installation if the new floor covering is not a thick as your existing floor.
Back to Top of Page