PREPARING YOUR HOME FOR INSTALLATION
Protect Your Valuables
Work Environment
Preparing Your Baseboards
PROTECT YOUR VALUABLES
-
If furniture is to be moved, please remove and box any
items on or around the furniture.
-
Remove all hanging objects from the walls directly in
and around the area of installation. Vibrations from the installation may cause
damage to these items.
-
Disconnect and move any electronics, appliances, and
computers.
-
If flooring is to be installed in a closet, remove all
items on the floor and all low hanging items.
-
Our installers are not responsible for damage to valuables
that have not been removed from within or around the installation area.
WORK ENVIRONMENT
Our installers will need access to an area
where they can store and cut flooring materials during the course of an installation.
This area is typically a back porch or a car garage.
-
Our installers will need access to electrical power
in the installation and storage area.
-
The interior temperature of the installation area must
be kept at a minimum of 65°F 48 hours prior to the installation and 48 hours following
installation.
PREPARING
YOUR BASEBOARDS
- In some cases, the new flooring may not be
as thick as your existing floor. As a result, some of the old paint lines on your
walls may show after installation. You may have to repaint any painted baseboards
after installation if the new floor covering is not a thick as your existing floor.
Back to
Top of Page